The customer, a manufacturer of plastic caps and closures for the beverage industry, approached their local Hayley Group branch to help them to optimise the use of pumps at their facility.

 

A representative from the branch, along with a member of the specialist pumps team attended site to conduct a system audit. They found over 50 Grundfos multistage pumps being used for high pressure cooling purposes, some of which were 10-15 years old and in need of an overhaul.

 

Do you want to learn if you could save money on the running costs of your pumping assets? Speak to your local Hayley Group branch today!